Sub-station

Ways to Install Electrical Boxes

by:HKKYO     2020-07-27
Installing electrical boxes is both fun and detailed. Fixtures can give houses an extra 'umph'. However, one has to be very careful when installing them. Follow the instructions below to achieve a safe and solid job. WHAT YOU WILL NEED: Electrical Box Voltmeter Stud finder Laser Level Jig Saw Hammer Screw driver (Phillips and/or Flat head) Electricians Pliers Ladder STEP 1: To prepare for your installation, take a getaway down towards the hardware and get the quantity of boxes need to have to. Keep in mind the job that possess to to do; the type of box would depend on whether you're installing in the brand new area or remodelling. For example, boxes that will head to be present in new construction come with nails to require the box to a wall man. Remodelling boxes will generally have securing 'fins' at 2 or more corners among the box. For those who are using prefabricated construction, increasing your electrical boxes made tailored for those regarding construction. Act wisely to discover your material dealer for details. STEP 2: When are generally getting in order to do the installation, you should to mark the location for your new electrical box. Next, be sure to empty the associated with furniture along with other objects that hinder safety or access and waste no level of locating the electrical panel feeding pick an as well as the circuit breaker feeding the circuit this agreement you are adding fresh box. You need to Close down the circuit breaker feeding the segment. Check to see if your power is off by using a voltmeter to verify zero volts to the circuit. Then, start your installation. STEP 3: If you might be installing your box using a wall, components to define the height requirements. Really are millions different codes within different municipalities. General numbers are as follows: general receptacles should be 14 to 16 inches above the floor; switches, kitchen receptacles and garage receptacles end up being 46 to 48 inches above the floor; and vanity receptacles should be 42 to 44 inches above the floor. STEP 4: Be particular everything is aligned. Start to to fasten a laser level to a wall stud upstream for the wall box at correct height to align all boxes being installed then attach the electrical box to a wall stud by hammering the attaching nails onto the box in the wall true stud. Align the top of your box along with laser level line and connect the box so that the front side of the box protrudes beyond the stud your thickness of your wall turn out to be installed. STEP 5: Next, must to punch the required number of knockout plugs from the electrical box depending on whether the circuit can finish at solitary pilot is a box or why not be daisy-chained and install a rubber grommet around the within of each knockout (if using metallic box). STEP 6: Run the very best size wire into the grommeted hole and prepare the wire using electrician's pliers. If device installation isn't taking place immediately, it best in order to not prepare the wire--coil the wire in box and fasten a cover to prevent accidental access. STEP 7: For wall wall box installations a good existing area you need to have attach a laser level to the wall to align the new electrical box with the present boxes. Use a stud finder to seek for a hollow area between wall studs to mount the box. STEP 8: Use the template provided with the box to monitor a cutting pattern in the wall, confident to align the top of the template to the laser level line, then use a jigsaw to lessen a hole in the wall, making use of the tracing while your guide. Punch the required number of knockout plugs from the electrical box before inserting the box into the wall. Grommet the holes (if any metal box) and pull the wire into brother ql-570 comes with. Insert the electrical box inside the hole until it stops. A small ridge on the front fringe of the box will try to box from going with hole and often will aid in securing software program to the wall. STEP9: Use a screwdriver to show the 'fin' screws clockwise on each corner with the box until tight. May turn the 'fins' outward to press against the bed side of your wall, securing the box to the wall. Complete the installation as previously outlined. STEP10: When installing ceiling boxes for fans or other heavy fixtures you do purchase the box made specifically to maintain heavy objects (joist-mounted). The assembly can have rails that suited between the ceiling joists and could be either attached (new construction) or pressed (remodel) in between your joists. The electrical box will hang off the rail assembly so how the fixture weight will be supported with the ceiling joists and not the fly. STEP11: Use correct size ladder to achieve ceiling height for anyone are working out. Then secure the joist attachment guarantee that the electrical box will be flush whilst installed or existing fly. Complete installation as previously outlined for either new construction or remodel. For more information, have a look at us at http://www.mytorontoelectrician.com/
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...